azwerkswerkregister
azwerks werkregisterpublic register
№ 07 · PROCESSazw-rec-007
candidate

surface adherence remediation

The remediation pass that checked first public surfaces against Radium component, token, public-boundary, claim, and accessibility rules.

Public record · partial proof

  • remediation
  • adherence
  • public boundary
  • proof posture
DomaingovernancePublished2026-07-01Updated2026-07-01Proof2Relations2

Record metadata

Record ID
azw-rec-007
Slug
surface-adherence-remediation
Visibility
public
Classification
documentation
Domain
governance
Type
process
Maintainer
azwerks
Version
0.1.0
Created2026-07-01Updated2026-07-01Strengthlimited
partial

First recorded and last updated . The current content is conservative, evidence-backed, and bounded by caveats.

Claims

02

Bound claims

2 caveats

Claims are presented with limited proof posture and explicit caveats.

Claim posturepartial

The remediation pass that checked first public surfaces against Radium component, token, public-boundary, claim, and accessibility rules.

Strength
limited
Proof
partial
Visibility
public

Limits

The remediation pass improved adherence but did not complete search, visual regression, or full accessibility coverage. Remaining risks are documented as open matters rather than hidden.

Proof ledger

2

Independent public artifacts that support this record. Missing proof remains visible through caveats.

  • Surface remediation report

    source-cited

    Documents fixes applied to first surfaces, public-boundary checks, component preservation status, and remaining risks.

    File:
    docs/azwerks-portfolio-surface-remediation-report-v1.0.md
    Scope:
    remediation

    The report documents a remediation pass, not complete quality certification.

  • Surface remediation plan

    source-cited

    Lists audit findings, severity, affected routes, and proposed fixes before remediation work.

    File:
    docs/azwerks-portfolio-surface-remediation-plan-v1.0.md
    Scope:
    audit plan

Surface remediation report

source-cited

Documents fixes applied to first surfaces, public-boundary checks, component preservation status, and remaining risks.

File:
docs/azwerks-portfolio-surface-remediation-report-v1.0.md
Scope:
remediation

The report documents a remediation pass, not complete quality certification.

Surface remediation plan

source-cited

Lists audit findings, severity, affected routes, and proposed fixes before remediation work.

File:
docs/azwerks-portfolio-surface-remediation-plan-v1.0.md
Scope:
audit plan

Evidence sequence

2

Ordered path from source contract to demonstrated route behavior.

  1. 01

    Surface remediation report

    source-cited

    Documents fixes applied to first surfaces, public-boundary checks, component preservation status, and remaining risks.

    File:
    docs/azwerks-portfolio-surface-remediation-report-v1.0.md
    Scope:
    remediation

    The report documents a remediation pass, not complete quality certification.

  2. 02Current

    Surface remediation plan

    source-cited

    Lists audit findings, severity, affected routes, and proposed fixes before remediation work.

    File:
    docs/azwerks-portfolio-surface-remediation-plan-v1.0.md
    Scope:
    audit plan
  3. ConclusionLimited proof onlyThe first surfaces are composed, but record hardening and quality checks remain open.

Capability coverage

Coverage is intentionally conservative; partial means not fully proven.

CapabilitySourceBuildA11y
Adapter compositioncandidateProvenPartialNone
Public filteringreview-requiredPartialPartialNone
Record hardeningopenPartialNoneNone
  • Proven
  • Partial
  • Claimed
  • None

Operation ledger

Authored operations behind this public content record.

Remediation

  1. Remediation2026-07-01

    completed

    Audit first public surfaces

    Checked implemented surfaces for vendor integrity, component preservation, token compliance, public boundary, proof posture, and accessibility basics.

    Intent
    Find drift from the Radium and werkregister contracts before adding more content.
    Action
    Created a remediation plan with categorized findings and reviewed the implemented route files.
    Result
    Clear findings were documented before focused fixes were applied.

    The audit did not replace future visual, accessibility, and interaction test suites.

  2. Remediation2026-07-01

    completed

    Apply adherence fixes

    Applied focused corrections to keep first surfaces aligned with design-system, public-boundary, and proof-state rules.

    Intent
    Strengthen the first public surfaces without redesigning or recreating Radium components.
    Action
    Patched clear issues and documented deferred matters in the remediation report.
    Result
    The route set remained static-first, vendor source remained untouched, and unresolved quality gaps stayed visible.

    Search fallback, full test automation, and deployment hardening remain open.

Matter ledger

Open matters remain open. Settled decisions are listed separately.

Open remediation matters

  1. Open questionmat-remediation-quality-followup2026-07-01

    open

    Run broader quality hardening

    The remediation pass addressed clear implementation drift, but search fallback, visual regression, and full accessibility checks remain future work.

    Position
    Carry the remaining items into search and quality prompts rather than presenting them as complete.

    Open matters remain visible on the public record.

Decision

How should surface drift be corrected?

ChosenApply focused adherence fixes without redesigning pages or replacing Radium components.

The remediation pass is meant to preserve the existing design-system contract, not create a new visual system.

Alternatives considered

  • Redesign surfacesWould exceed the remediation scope and risk generic portfolio drift.
  • Create new local UI primitivesWould bypass the existing Radium component contracts.

Consequences accepted

  • Remaining risks stay visible as matters and follow-up prompts.
  • Surface changes remain narrow and report-backed.
Recorded
2026-07-01
Source
surface remediation report

Relation trace

Related work is expressed as relation language, not as more projects.

Remediation scope

COLOPHON · № 07azw-rec-007
Created
Updated
Record ID
azw-rec-007
Version
0.1.0
State
candidate
Maintained by
azwerks
Derived from
Surface remediation plan, remediation report, and current page source.

LimitsAdherence record; broader quality automation remains future work.